Figure 6: Diagram showing a 3rd rail DC energy provide system and how present rail gaps are provided the place the substations feed the line. Figure 4: 3rd rail present assortment system on the brand new York Subway showing the third rail with a picket cover fitted to scale back the effects of snow and ice. At various factors along the line, there will be locations the place trains could be briefly remoted electrically from the provision system. There have to be gaps within the thrid rail where crossovers or junctions are provided. The **tact with the overhead wire isn't normally damaged but the third rail should be damaged at junctions to permit for the **tinuity of operating rails. The tendency of return currents to wander away from the operating rails into the ground ** set up electrolysis with water pipes and **parable metallics. 25 kV and the feeder wire at -25 kV thus the voltage in between these circuits is 50 kV however to floor is 25 kV. The **tact wire is grooved to permit a clip to be fastened on the highest aspect (Figure 7). The clip is used to attach the dropper wire. An example of a backside **tact shoe as used on the Dockland Light Railway line in London is shown in Figure three and within the video (Figure 5). Some top **tact systems have additionally used spring loading however they are mechanically tougher to **trol because of the searching action of the bogie and the risk that the sneakers will get trapped under**h the head of the rail and turn it over.
It also suffers during bad weather, the smallest quantity of ice or snow rendering prime **tact third rail methods virtually unworkable until costly treatments are carried out. It's an embarrassing nuisance solely solved by being pushed onto the third rail by another train or by obtaining special long leads with a plug at one end for the practice and shoes at the other finish for the third rail. The French TGV (High Speed Train) formation has a power car at each finish of the prepare but only runs with one pantograph raised be**h the high speed 25 kV AC lines. There needs to be a whole circuit, from the supply of the energy out to the **suming merchandise (mild bulb, cooking stove or prepare) and back to the supply, so a return **ductor is required for our railway. Regardless of this, there will be issues. A practice moving at speed with its pantograph hooked over the wire ** carry down several kilometres of line before it is detected and the practice stopped (Figure 12). Probably the most sophisticated pantographs have horns that are designed to interrupt off when struck laborious, for instance, low voltage power cable by a dropper or catenary support arm.

Figure 5: Simple diagrams of several types of 3rd rail **tact systems. Later systems had radially mounted sneakers to supply extra stable **tact through lever motion. Top **tact systems with protecting covers over them, like the brand new York Subway (Figure 4), needed radially mounted footwear anyway to permit them to suit under**h the cowl. The mechanics of power supply wiring is just not as simple because it appears to be like (Figure 1). Hanging a wire over the track, providing it with present and operating trains below it isn't that easy whether it is to do the job correctly and last lengthy sufficient to justify the expense of putting in it. Figure 3: Docklands Light Railway train with 3rd rail backside **tact electrification system. Each DMX system has 512 addresses, subsequently a grasp is able to **trolling max. They're used when it is essential to isolate a practice with an electrical fault in its present assortment system. The potential difference or voltage essential for the present to stream, produces an electric area. Side and backside **tact shoes are spring loaded to offer the mandatory **tact pressure.
It's a prime **tact system. The third rail system uses a "shoe" to collect the current on the train, perhaps as a result of it was first called a "slipper" by the pioneers of the trade (it slipped along the rail, Ok?) however it was not very pretty to have a look at, so maybe somebody thought shoe was a greater description. Isolation used to **tain i**ing a wood "paddle" between the shoe and the present rail and then tying the shoe up with a strap or rope. Pantographs are easy by way of isolation - you just decrease the pan to lose the facility provide to the car. At such places, like terminal stations, "section switches" are supplied. The opposite shoes on the identical circuit have to be isolated whereas this is finished, until the present is switched off from the whole section - perhaps disabling several other trains. Si**he current could have been switched off to cease an arc or because of a short circuit, it is important that the practice does not co** the lifeless part to the dwell section by passing over the hole and allowing its busli**o bridge the gap. Woe betide the driver who stops his train with all of the footwear "off juice" or "gapped".
发表评论 评论 (0 个评论)